BauBau

    For independent Bauleiter and architects: professional reports across every client

    You coordinate many trades with a small team and lose evenings formatting reports and chasing photos.

    Today

    You format site reports by hand and chase several trades for photos before every client meeting.

    With BauBau

    Updates land on the right site, issues can be pinned on the drawing, and the daily report is built from confirmed entries.

    A normal day with BauBau

    1. 1

      On site: you and the trades capture photos; issues are pinned on the drawing where they are.

    2. 2

      After the visit: drafts are checked and confirmed; open issues get an owner and a due date.

    3. 3

      Next morning: the daily report is ready in the site's report language with a verification link.

    The features that do the work

    Drawings with plan pins

    Place issues and photos on the uploaded plan.

    Daily reports

    Built only from confirmed entries, finalised once per site and day.

    Report language per site

    The official report language follows the site, not the reader.

    Read the guide

    The usual worry

    Do I need a big suite? No — start with the diary and reports, and invite only the people each site needs.

    Example data, not a real site

    Plan pins: every issue has a place on the drawing

    Tap a pin on this example drawing to see what BauBau keeps with it.

    Ground floor, revision B

    Bathroom tiles cracked

    Photo attached to the pin
    Trade
    Tiling
    Status
    Open
    Next step
    Return visit planned, awaiting approval

    Pins remember the drawing revision. When a new revision is uploaded, you choose to keep or re-pin each one.

    Solutions you'll use

    Where this role spends most of its time in BauBau, and why.

    Your first step

    For independent Bauleiter and architects: professional reports across every client

    See who pays

    Other people on the job