Review the day on site from your phone
For Bauleiter, foremen and supervisors who check the work and decide what happens next.
Before
You write the diary in the evening from memory and photos spread across phones.
With BauBau
Entries from your crew arrive as drafts with photos. You review, approve and see what needs attention: open issues, unconfirmed hours and safety deadlines.
Result
One daily report per site, built only from confirmed entries, ready to sign and share.
How it works in BauBau
- 1
See every site's day on one screen: confirmed entries, open drafts, issues and weather.
- 2
Review AI drafts, correct them and approve — after 24 hours confirmed entries are locked.
- 3
Get urgent issue alerts and a daily summary on Telegram.
- 4
Finalise the daily report in the site's report language and share a verification link.
Need your company to approve it? We can help you put the case together.
Who this is for
- Who uses it
- Bauleiter, foremen and site supervisors responsible for the daily record.
- When it helps most
- A subcontractor reports completion, evidence is incomplete and the report is due.
- What you can show
- A daily report built only from confirmed entries, with versioned corrections and a verification link.
Built into BauBau today
Needs attention
Unconfirmed drafts, pending hours, open issues and safety deadlines in one list.
Read the guideDrawings and plan pins
Pin photos and issues on the plan so the location is clear later.
Read the guideDaily report lifecycle
Draft, review and finalise one report per site and day; finalised reports are not edited.
Read the guideHandover and checklists
Record handovers with reservations and work through checklists on site.
Read the guideWhat changes for each person on the job
Pick your role to see the problem BauBau solves, how it works and where to read more.
Hundreds of photos across chats, and the diary is written from memory at night.
Drafts arrive with photos; Needs attention shows open issues, unconfirmed hours and safety deadlines first.
Can the AI put something in my report I did not check? No — only entries a person confirms count.
See the full pageNeed your company to approve it? We can help you put the case together.
Talk to usFrom draft to confirmed record
Switch between the two states a diary entry goes through.
- Photo: screed laid in rooms 1.02–1.04
- AI suggestion: work status In progress (editable)
- Foreman adds: second layer tomorrow
AI suggestions are labelled. Nothing counts until a person confirms.
05.11.2026: 660 of 1200 fixtures confirmed (55%). Between updates the chart shows the last confirmed value — never an invented daily measurement.
Package finish 18.11.2026 · 6 days after plan
In this example, confirmed work is behind the plan for this package. The projection is a scenario, not a promise: it does not know about crews, site access or material deliveries.
Follow one site update
Interactive vision · Illustrative exampleHow a photo from the field becomes a record your team can rely on.
Photo + voice note: "60 more fixtures installed today, 2nd floor."
A short update from the field — in the app, on Telegram or WhatsApp.
Works with gloves and weak signal: without internet the phone keeps the capture and uploads it later. Photos stay private to the site team.
What happens to the record?
AI only prepares a draft. A person checks and confirms it, and confirmed entries cannot be changed afterwards — corrections are saved as a new version with name and time. Photos stay private to the people who have access to the site.
Common questions
Can I correct a confirmed entry?
Yes, as a new version with your name and time. The original stays in the history.
Does approving a draft mean the work is accepted?
No. Confirming a diary entry records what was documented; acceptance and acknowledgement are separate steps.
Can a supervisor see the report without editing it?
Yes. Supervisor and assistant access is read-only for the sites they are invited to.
Bring BauBau to your company
Need your company to approve it? We can help you put the case together.
