Shifts and schedule
Use the schedule to plan who works which shift at each site. A site can be a construction site, an office, a hotel or any other place where your people work. Managers and site foremen plan shifts; workers see their own shifts, clock in, fill the shift checklist, write a shift log and can ask a colleague to take over.
A planned shift is not worked time. Hours come from clock-in and clock-out, or from the times a worker confirms after the shift, and are approved as usual.
Planning shifts
- Open Schedule in the menu. You see the week for all sites, or pick one site. Switch between Week and List.
- Press New shift. Choose the site, a name, the date, start and end time and the break. Tick Ends the next day for night shifts.
- Add the roles you need and how many people for each, for example 2 × Security guard and 1 × Shift lead. Each person needs one place.
- Optional: choose a checklist that has to be filled during the shift, and write instructions.
- Press Save draft. Then open the shift and assign a person to each place.
- Press Publish shift. Only now do the assigned people see the shift and get a notification.
Only people on the site's team can be assigned. Nobody can be on two shifts at the same time; BauBau refuses the second assignment. Times are saved in the site's time zone. On the night the clocks go back, BauBau asks whether you mean summer or winter time; on the night they go forward, a time that does not exist is refused.
On a phone, Suggest staff and Scheduling rules are under ⋯ at the top right, and the state, staffing and time-zone choices open under Filters.
Changing the time of a published shift tells everyone on it. Cancel shift keeps the shift in the history, tells everyone and closes open swap requests.
On the week or day view, press Plan people to plan on the board. Drag a person onto a shift to give them an open place, or tap the person and then Assign here on a shift (this works on phones and with a keyboard). If a shift has places for different roles, BauBau asks which place. Drag a draft shift to another day, or press the move button on it and then Move here on the day; the times of day stay the same. Only drafts that have not started can be moved this way; change published shifts on the shift page. When the plan is ready, Publish drafts publishes every draft shift in the range after you confirm. BauBau still checks every assignment and refuses double bookings, people outside the site team and rule breaks.
Inviting someone new to an open place
Company managers can fill an open place with someone who does not use BauBau yet. On the shift page, press Invite someone new under the open place, enter their email and press Send invite. They get an invite link for this one site. When they open it, they create an account or sign in, accept the BauBau Terms, join your company and the site, and then take the place. BauBau runs the same checks as a manual assignment; if the place was filled meanwhile, the shift changed, or the person would be double-booked or over a limit, they still join the site and you get a notification to assign someone. The open place shows Invite sent until then; you can copy the link or withdraw the invite. Places that need a confirmed qualification cannot be filled by invite, and people already in your company are picked from the list instead. On a draft shift, the invited person sees the times only after you publish it.
Your shifts
Open My schedule to see your shifts for the next three weeks.
At the top, My schedule shows the shift you can work right now. From 30 minutes before the start, press Start shift. While it runs you see since when you are clocked in and how long you have worked, with Start break / End break and End shift (you can add a short note on what you worked on). If no shift is open yet, it shows your next shift and from what time you can start it. The time comes from the server and your manager still approves the hours; the planned shift times never count as worked hours by themselves.
- Clock in for this shift appears 30 minutes before the start. It uses the normal clock-in, so it also works without a connection and is sent when you are back online. Your clock-in is linked to the shift.
- Who's on shows the roles and colleagues on the same shift.
- Checklist opens the shift's checklist. Answer each item and press Finish checklist. After finishing, answers can no longer be changed.
- Shift log saves what happened to the site diary under your name with the time, for example a patrol round or a door found open. Write what you saw and did.
Your hours
In My schedule → Hours you see your own hours for each month: what your manager has approved, what is still waiting for approval, and how much came from clock-in or was confirmed by you after a shift. A shift that is still running is not counted yet. Under Shifts, Recent shifts lists your shifts from the last days that have hours, newest first. Each one shows when you worked, the hours, whether they came from clock-in or were confirmed by you, and whether they are Waiting for approval or Approved. Tasks, the shift log and who was on the shift stay one tap away.
To sign your own month, press Sign my month under Shifts, or scroll down in Hours. Choose the month, check your shifts, optionally draw your signature and press Confirm month. You can sign only your own times. Clock out first and accept or dispute any corrected shift before you sign. Signing confirms that your recorded times are complete and correct; it does not approve them. Your manager still approves your hours and your month. If your times change after you sign, the change is shown under your signature and you answer it per shift.
Forgot to clock out
If you are still clocked in after 12 hours, My schedule and Today show a warning: end your shift if you have stopped working. After 16 hours, End shift asks when you actually stopped working and why the time is different. The end must be after the start, not in the future and at most 16 hours after the start. The time you pressed the button is kept as the clock record next to the end time you enter, so your manager sees both before approving. If you ended the shift without a connection and it had been open more than 16 hours, it stays open and the same question appears the next time you open the app.
Managers see clock-ins open for more than 12 hours at the top of the site's Attendance tab and can press Set end time. A finished shift that is longer than 16 hours on the clock cannot be approved, one by one, all at once, by month or by the worker's own confirmation, until a manager corrects the end time or the worker corrects the times.
Approving hours on the shift page
Once a shift has started, its page shows Hours from this shift: for each person the actual start and end, the hours, and whether they came from clock-in or were confirmed by the worker. Press Approve hours for one person, or approve all waiting at once. This is the same approval as on the Hours page. Planned times alone never become hours.
Under Schedule → Settings → Hours confirmed by workers, a manager decides whether a worker's own confirmation approves their hours. It is on by default: a manager must approve. When it is switched off, clean confirmed hours count as approved and show Approved by the worker's confirmation; unusual shifts still wait for a manager. The change is saved in the company's history.
Confirming hours after a shift
If you worked a shift but did not clock in, My schedule shows it under Confirm your hours once the shift has ended. The planned start, end and break are filled in for you.
- Press Confirm my hours.
- Check the times. Change them if you started or finished at a different time or took a different break. Tick Finished the next day for a night shift.
- Add a note for your manager if something was different, then press Confirm hours.
Only confirm shifts you actually worked. The hours go to your manager like any clock-in: they appear on the Hours page and in the diary day's attendance, marked Confirmed after shift, and count only after your manager approves them. You can confirm up to 31 days after the shift; after that, or if your times are more than 12 hours away from the plan, ask your manager to enter them. A shift you clocked in for, or one you handed over to a colleague, is not shown here.
Month view on the Hours page
The Hours page opens on Month view for the chosen site. It shows Clock-in hours and hours Confirmed by worker after a planned shift as separate numbers, their Total, and how much is Approved or Waiting for approval. Below are the same numbers By worker and By day. Use the arrows to change the month, and filter by worker, by where the hours come from, or by approval. Breaks are already taken off. Shifts still clocked in are listed as a note and counted only after clock-out. Planned shift times alone never appear here. Workers see only their own hours; managers and site foremen see the whole site. The month view is read-only: you approve hours on the site's attendance page as usual. The manual lines are under Hours logged.
Download signed and approved hours (managers and site foremen): in the month view, choose what to include and the file language (English, German or Serbian), press Prepare file, then Download CSV. The file opens in Excel. Signed by the worker and approved includes only shifts a manager approved and whose worker signed the month; All shifts, with their status lists every shift. Each line shows the clock-in and clock-out exactly as recorded next to the official start, end, break and hours, whether the official time differs from the clock, who set it and the reason, the shift status, the worker's month sign-off and the manager's approval of that month. Dates and times are in the site's time zone. Shifts still clocked in have no hours and are not counted, and planned shift times are never included. Downloading changes nothing.
Hours dashboard
Managers and site foremen open Hours → Hours dashboard to see one month for every site of the company. For each site it shows hours Approved, Waiting for approval, Confirmed by worker and Clock-in hours, with the Total; the bottom row adds up all sites. Total is always approved plus waiting, and also clock-in plus confirmed by worker. Use the arrows to change the month. Pick a site in the list, or tap a site row, to see only that site's totals; By day then lists that site's days. By worker shows each person's approved, waiting, worker-confirmed and clock-in hours for the selected site, or across all sites with the number of sites they worked on. Sites without hours in the month are listed in one line, and shifts still clocked in are counted only after clock-out. Planned shift times alone never count. The dashboard is read-only: you approve hours on each site's attendance page as usual.
Hours page next to each site opens that site's Hours page on the same month. Download month saves a spreadsheet file (CSV, opens in Excel) for the month: one line per shift with date, site, worker, whether the hours come from clock-in or were confirmed by the worker, approved or waiting, start, end, break and hours, plus totals for approved, waiting and all hours. When one site is selected, the button is Download site month and the file holds only that site. Shifts still clocked in are listed without hours and not counted. Times are in each site's time zone. The download changes nothing in BauBau.
Shifts on the Hours page
Managers and site foremen see Published shifts under Hours logged on the Hours page for the chosen site: every published shift of the last 14 days and the next 7, with its date and times, who is scheduled in which role, and for each person whether they are clocked in, have clocked hours or hours confirmed after the shift waiting for approval, or have no hours yet.
Once a shift has ended, press Mark as done to close it for planning. You can add a short note. This does not add or approve any hours: people without hours can still confirm their own times after the shift, and you approve all hours in the list below as usual. Who marked the shift as done, and when, is shown on the shift.
If you can't come
Open the shift and press I can't come. Choose one of three ways:
- A colleague takes it: choose a colleague with the worker role from the same site. Managers, site foremen, office staff and clients are not offered. They answer under Swap requests. If no other worker is on the site, ask your manager instead.
- Swap shifts: choose one of a worker colleague's upcoming shifts. Both shifts change together or not at all.
- Ask my manager: your manager looks for someone. You can add a reason.
You stay on the shift until the change is applied. A manager approves every change, unless your company switched off approval for swaps that colleagues agreed on (see Scheduling rules). Requests end automatically when the shift starts. Changing the shift time closes open requests. Every step is recorded with who did it and when.
Follow your swap. Under My schedule → Swap requests each request shows its steps with the time: request sent, colleague agreed (or declined), and approved by the manager, or applied straight away if your company does not require approval. When a colleague asks you, press I'll take it or Decline there; a notice on the Shifts tab takes you to it with Answer now. Once the swap goes through you see Swap confirmed: who works the shift now, and how many open tasks went to the person taking over or stayed with the original person. The shift itself shows Swap confirmed too, and a shift waiting for an answer shows who it is waiting for. A confirmed swap is a change of plan, not worked time.
Open shifts
Under My schedule → Open shifts you see published shifts on your sites that still have free places. Press I'd like this shift. Asking does not reserve a place; your manager sees the request on the shift and accepts or declines it.
Availability
Under My schedule → Availability you enter when you are not available, or when you are. Your private note is only visible to you; managers see only the times. If you enter nothing, your availability is unknown. BauBau never assigns you when you said you are not available.
You can also choose Rather not work. Suggestions then pick you only when nobody else fits, and the manager sees a note. It never blocks you from a shift.
Views for managers
Schedule shows day, week, month, a list with pages of 25, 50 or 100 shifts, and People: every person with their shifts per day, including people without shifts. Filter by site, status and staffing. The page address keeps the view, filters, date, page and page size, so a reload or a shared link opens the same place in the list. On phones and tablets, the list and People show one card per shift or person instead of a wide table, so nothing scrolls sideways. If your sites are in different time zones, choose which time zone the days are shown in. If a range has too many shifts, BauBau tells you to narrow it instead of hiding shifts.
Shift dashboard
Managers and site foremen open Schedule → Shift dashboard for a quick check of the next 7 days: how many shifts are planned (and how many are still drafts), what share of places is filled, which published shifts still need people (those starting within 48 hours are marked), and everything Waiting for you: replacements and shift swaps colleagues agreed on, requests to find a replacement, and requests for free places. Press Review to open the shift and decide there. Choose a site to see only that site. Requests that expired or whose shift already started are not shown.
If a shift message can't be delivered, it appears under Messages that didn't go out (last 14 days). Tell the person yourself; the shift itself is unchanged. Each line shows who it was for and when it failed. For a reminder you can press Send again while the shift hasn't started; the line then shows when it went out.
When you approve a swap or a replacement and the person has open tasks on that shift, choose Give them to the new person (default) or Keep them with the original person. Done tasks always stay with the person who did them.
Scheduling rules and qualifications
Managers open Schedule → Scheduling rules to set the company's own planning limits: most planned hours per day and week, shortest rest between shifts, extra travel time between sites, a weekly target for fair suggestions and the week start. Empty fields are not checked. BauBau does not supply legal limits and does not confirm that a schedule meets working-time law.
The same page records role qualifications per person with an end date. A place can require a confirmed qualification: only people with a confirmed, valid qualification for that role can be assigned. Switch I checked the proof on only after you have seen it.
Workers can send their own certificates: My schedule → Qualifications (on phones under More). Choose First aid, Crane operator, Site lead or Other, enter the valid-until date and add a photo or PDF of the certificate, then press Send for approval. Managers get a notification and see the request on Scheduling rules → Qualifications. They open the certificate and press Approve, or Not approved with a reason the worker sees. A manager cannot approve their own certificate. Only approved certificates count for places that need a qualification. Approving records that a manager checked the certificate; BauBau does not check whether it is legally valid. Certificate files are private to the worker and the company's managers and foremen.
Managers can also add a certificate for someone in the team, for example a worker without a phone: on Scheduling rules → Qualifications, choose the person and the qualification, enter the valid-until date, add the photo or PDF and press Upload and save. The qualification is recorded as checked by that manager, counts for shift places right away and the person gets a notification. A manager's own certificate must be added or approved by another manager. If the person already sent the same certificate, answer that request instead.
Reminder before a shift (managers): off unless you switch it on. People on a published shift then get a reminder in BauBau 1, 2, 4, 12 or 24 hours before it starts, at most once per shift. The reminder goes out at that time, within about a minute. BauBau only checks when a reminder is actually due, so nothing runs in the background while no reminders are waiting.
Rules and templates for one site
On Scheduling rules → Sites, choose a site.
- Shift templates: managers and site foremen save shifts they use often (times, break, people needed, instructions). Create shifts makes one draft shift per chosen weekday for up to 8 weeks (at most 60 at once). Shifts start as drafts without people; workers see them after you publish. If a date can't be created, for example a time that doesn't exist when the clocks change, BauBau lists it and Try again creates only the missing dates, never a second copy.
- Overtime warnings (managers): hours per day and per week at this site. Above the limit, BauBau shows a warning on the shift and next to the person's hours. It never blocks a shift and does not calculate overtime pay.
- Hours check (managers): when clock-in or clock-out differs from the shift start or end by more than the set minutes, the hours show Differs from the plan — check before approving. Approval stays with you.
Suggest staff
Schedule → Suggest staff fills open places in published shifts for up to 14 days and selected sites. Every suggestion passes the same checks as a manual assignment: on the site's team, qualification, not double-booked, availability, rest and hour limits. People with unknown availability are suggested with a warning. The score only ranks people who passed the checks.
You can keep a suggestion, ask for someone else, decline a person or suggest again. Save plan stores the suggestions without telling anyone. Assign selected checks each pair again and shows exactly which were assigned and why others were not.
Person shows only one person's suggestions; the others are hidden, not removed, and Assign selected then assigns only what is shown. People you removed with Not this person are listed under Removed, with Allow again. The period, sites, person and open plan stay in the page address, and removals stay on the same device after a reload, so you can pick up where you left off. Save plan keeps the removals in the plan for everyone.
Suggestions from an assistant. A connected assistant can answer "who can cover the open places next week?" with the same checks and ranking. For each person it gives you a link. The link opens the shift with that person marked for that place under Suggested by an assistant; check the person and press Assign. The app checks every rule again, so if the place was filled or the person became busy in the meantime, you see why and nothing changes. Dismiss hides the suggestion. The assistant itself can never assign, invite or publish.
Tasks and the diary
On a shift, managers link existing site tasks and can name who is responsible. Workers see them under Tasks on their shift. When a swap, shift swap or replacement goes through, the person taking over gets the open tasks. If a manager removes someone without a replacement, their open tasks are marked Check task. Finished tasks, checklist answers and shift logs always stay with the person who did them. On an unconfirmed diary entry you can press Link to my shift while you are on a shift at that site. Linking never changes the entry, its hours or its confirmation.
Shifts in the site diary
Managers and site foremen see Planned shifts on the Shifts tab of each diary day: every shift that touches that day (an overnight shift shows on both days), who was scheduled in which role, who took over after a swap or replacement and who approved it, whether each person finished the shift checklist, how many shift logs they wrote, and the tasks linked to the shift with how many are done. Cancelled shifts are left out. This is the plan, not worked time: hours come from clock-in and clock-out or from times the worker confirmed after the shift, and only after approval.
The site diary PDF lists published shifts in an Appendix: planned shifts after the signatures, for managers and site foremen only. For each shift it shows the date and site-local times, who is scheduled in which role with their checklist status, open places, linked tasks (done or open) and confirmed shift logs with their reference. Draft logs and draft or cancelled shifts are never listed. The appendix is the same for every site country. It is the plan, not proof of presence or hours: it never counts toward crew, hours or totals, and the diary signatures do not cover it. Publish a shift with Publish shift on the schedule to include it.
Type of site
On a site's Schedule tab, a company manager can set the type of site: construction site, office, hotel, building or facility, or other place. It is used for wording and planning and does not change any records. Managers can switch the Schedule tab off per site like other optional tabs.
Move a shift to another site. On a shift that has not started, choose Move to another site. The shift keeps the same moment in time; if the new site is in another time zone, its local times are shown in that zone. Everyone already on the shift must be on the new site's team, otherwise nothing changes. Open tasks linked to the shift are marked for review, and the people on it get a notification.
